ESTIMATION
Accurate cost analysis and material quantification for competitive bidding and budget planning.
Quantity Take-off (QS) from IFC Drawings

Extracting accurate measurements and quantities from "Issued for Construction" (IFC) drawings.

3-5 days 📊 Excel format
BOQ Preparation

Developing a comprehensive Bill of Quantities based on the measured data.

2-4 days
Compliance Statement

Drafting a statement to confirm that all proposed materials and methods meet the project specifications.

1-2 days
Material Take-off (MTO)

Generating a detailed list of all physical materials required for the project.

3-5 days
Supplier Inquiries & Price Negotiation

Sending out inquiries to approved vendors and negotiating competitive pricing.

5-7 days
Material Costing & Analysis

Finalizing the total project cost based on the detailed material list and supplier quotes.

2-3 days
Offer Letter / Quotation Preparation

Preparing the final formal bid or commercial proposal to be submitted to the client.

1-2 days
DESIGN
Detailed technical drawings and structural analysis for fabrication and installation.
Shop Drawings

Detailed drawings that translate the design intent into a practical guide for site installation.

7-14 days 📐 AutoCAD/Revit
Fabrication Drawings

Highly specific drawings used by the workshop or factory for the manufacturing process.

10-15 days
Structural Calculations

The formal engineering analysis and mathematical data used to verify the integrity of a structure.

5-10 days 📐 ✓ PE stamped
As-Built Drawings

The final set of drawings submitted after construction is complete.

5-7 days
SUBMITTALS
Comprehensive documentation packages for approval, compliance, and quality assurance.
Prequalification Document (PQD)

A formal package submitted to prove a company's capability and experience.

3-5 days
Method Statement

A step-by-step guide detailing how a specific task will be executed safely.

2-4 days
Material Submittals

A formal package (including data sheets and samples) for consultant approval.

3-5 days
Inspection and Test Plan (ITP)

A structured document that outlines the quality control points.

2-3 days
Risk Assessment (RA)

Identifying potential hazards and implementing measures to reduce them.

2-3 days